A building permit is required in Victoria for a wide range of construction, alteration, and demolition works to ensure the safety, compliance, and structural integrity of buildings under the Building Act 1993 and the Building Regulations 2018.
The primary purpose of a building permit is to confirm that your proposed works comply with the National Construction Code (NCC), applicable Australian Standards, and relevant planning and safety requirements.
You must obtain a building permit before starting work on the following (but not limited to):
Construction of a new dwelling or commercial building
Extensions, renovations, or alterations to an existing building
Construction of garages, carports, verandahs, or pergolas (depending on size and attachment)
Decks and balconies
Retaining walls greater than 1 metre in height or those that support additional loads (e.g., fencing or structures)
Installation or removal of walls, including load-bearing walls
Construction or alteration of swimming pools and pool safety barriers
Demolition or relocation of buildings
Construction of sheds or outbuildings over certain sizes (generally over 10m² or if attached to another structure)
Installation of temporary structures such as marquees (for public events or long-term use)
Some minor works may be exempt, including:
Small garden sheds (under 10m² and not attached to another structure)
Painting, tiling, and general maintenance
Replacing fixtures or finishes (non-structural)
Low fences (generally under 1 metre)
⚠️ Note: Even if a building permit is not required, planning permits, easement consents, or other approvals may still apply depending on your local council regulations.
To determine whether your specific project requires a permit, you should:
Consult a registered building surveyor
Check with your local council’s building department
Review the Building Regulations 2018 – Schedule 3, which outlines exemptions
Building without a permit is a serious offence under Section 16 of the Building Act 1993
It can result in:
Enforcement action (e.g., Building Notices or Orders)
Legal penalties, including fines of up to $92,460 for individuals
Difficulty selling, insuring, or refinancing the property
Requirement to demolish or rectify the unauthorised works
If you're unsure whether your project requires a building permit, we can assess your plans and provide expert guidance.
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
We’re here to help you build legally, safely, and with confidence.
In Victoria, a building permit may be issued before the registration of a plan of subdivision, provided that strict conditions are met to ensure that the proposed works will not compromise planning, legal, or regulatory frameworks.
While not common practice, issuing a building permit prior to registration is permissible under Regulation 37(1) of the Building Regulations 2018, which allows for a building permit to be granted for a lot within a proposed subdivision if:
The building surveyor is satisfied that the subdivision will be registered without alteration to the lot on which the building work is proposed; and
There are no planning restrictions or covenants that would prevent the use or development of the land; and
All relevant authorities (e.g., council, water, electricity, sewer) have approved the subdivision and any required agreements (e.g., Section 173 agreements or restrictions) have been properly executed.
Permit Validity: The building permit only applies if the land is ultimately registered in the form shown in the application. If there are changes to the subdivision, the permit may be invalidated.
Title Dependency: Occupancy Permits and Certificates of Final Inspection cannot be issued until the certificate of title is registered and available for the relevant lot.
Lender and Contractual Constraints: Many financiers and building contracts require that title be registered before construction commences.
This approach is occasionally used by volume builders or developers looking to fast-track the construction timeline for display homes, presales, or to align construction commencement with settlement dates. However, it should only be undertaken with:
Clear legal advice
Full cooperation from the developer
Approval from a registered building surveyor who is comfortable issuing the permit on this basis
If you’re considering applying for a building permit prior to subdivision registration, our team can review your proposal, assess its eligibility, and help you mitigate risks.
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
We can guide you through the subdivision and building permit interface with clarity and compliance.
No. Under Victorian legislation, a building permit must not be issued if the proposed building work is inconsistent with an active planning permit or planning scheme controls. The Building Act 1993 and Building Regulations 2018 require the Relevant Building Surveyor (RBS) to ensure that building documentation is consistent with the planning approval before granting a permit.
When a planning permit has been issued, it typically includes:
Endorsed plans that must be adhered to
Conditions that influence the building’s location, height, use, or appearance
Requirements relating to setbacks, overlooking, site coverage, materials, or environmental overlays
If your building permit application conflicts with any of these conditions or documents, the RBS must not issue a permit until the inconsistency is resolved.
Building layout or footprint differs from endorsed planning drawings
Increased building height not allowed under the planning permit
Setbacks, fencing, or materials vary from the approved conditions
Planning overlays (e.g. BMO, heritage) not properly addressed in the building design
Failure to comply with Section 173 Agreements or landscape plans
You have two options:
Amend the Planning Permit: Apply to the responsible authority (usually the local council) to vary the planning permit or endorsed plans.
Revise Building Documents: Adjust your building design and documentation to match the approved planning permit.
The building surveyor may require written confirmation from council before proceeding if there’s any doubt about consistency.
If your project is stalled due to a planning/building inconsistency, our team can:
Review both your planning permit and building documentation
Identify areas of non-compliance
Assist in preparing amendments or revised plans to satisfy both authorities
📞 Phone: 0405 956 655 📧 Email: compliance@victorianbuildingsurveyors.com.au
We can help you get back on track and ensure your building permit application is compliant and ready for approval.
The role of a Building Surveyor in Victoria is defined under Part 6 of the Building Act 1993 and recognised in the National Construction Code (NCC) as an Appropriate Authority. A Building Surveyor plays a vital statutory role in assessing and certifying building work to ensure compliance with relevant legislation, codes, and standards.
A Building Surveyor—whether operating as a Relevant Building Surveyor (RBS) or a Municipal Building Surveyor (MBS)—is authorised to perform the following key functions:
Issuing Building Permits
Assess proposed designs and documentation for compliance with the Building Act 1993, Building Regulations 2018, and the National Construction Code (NCC)
Grant approval for construction to commence
Carrying Out Mandatory Inspections
Conduct inspections at various stages of construction to ensure works align with the approved building permit and comply with all relevant regulations
Issuing Occupancy Permits or Certificates of Final Inspection
Upon satisfactory completion of construction, certify that a building is safe and suitable for occupation or use
Determining Compliance with Performance Requirements
As an Appropriate Authority, the Building Surveyor has the power to determine whether a method of construction satisfies the relevant Performance Requirements of the NCC, particularly when using Performance Solutions instead of Deemed-to-Satisfy provisions
It is important to note that the role of a Building Surveyor appointed for a building permit is not the same as that of an appropriately qualified person, such as a structural engineer, mechanical engineer, or architect.
The Building Surveyor does not create or provide evidence of suitability
They rely on expert reports, certifications, and documentation from qualified practitioners as part of the Documentation of Design and Construction (as detailed in Part A5 of the NCC)
The surveyor's role is to assess the adequacy and sufficiency of that evidence when determining compliance
Building Surveyors are bound by law to act independently and impartially in the public interest. They must not have a financial interest in the building work and are subject to regulation and discipline by the Victorian Building Authority (VBA).
We provide comprehensive building surveying services across Victoria, including:
Building permit assessments
Statutory inspections
Performance Solution evaluations
Occupancy certifications
Expert guidance on code compliance
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help ensure your building project is compliant, efficient, and legally sound.
Yes, you do need a building permit if you are removing an internal load-bearing wall in Victoria.
Under the Building Act 1993 and the Building Regulations 2018, a building permit is required for any structural alteration, including the removal, alteration, or replacement of load-bearing elements. This applies regardless of whether the work is internal or external.
Removing a load-bearing wall can significantly affect the structural integrity of your building, and the permit process ensures that:
The proposed work complies with the National Construction Code (NCC)
A qualified structural engineer has assessed the impact and, if required, designed a suitable replacement structure (e.g. beams or lintels)
The work is performed safely and does not endanger occupants or neighbouring properties
To obtain a permit, you may be asked to provide:
🏗️ Structural engineer’s report Confirming the wall is load-bearing and recommending appropriate support measures
📄 Plans or drawings Detailing the alteration and how structural loads will be transferred
📝 Certificate of Compliance (s.238(1)(b)) From an engineer confirming that the design complies with applicable standards
Carrying out structural work without a building permit is a serious offence in Victoria and may result in:
Building Notices or Orders issued by council
Legal penalties and fines (up to $92,460 for individuals)
Insurance claim issues or property resale complications
Requirements to demolish or rectify the unauthorised work
If you’re planning to remove a load-bearing wall, we can assist you by:
Conducting an initial site inspection
Engaging a structural engineer (if required)
Preparing the required documentation
Lodging and managing your building permit application
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help ensure your renovation is safe, legal, and structurally sound.
In Victoria, certain mandatory building inspections must be carried out during construction to ensure compliance with the Building Act 1993, Building Regulations 2018, and the Building Permit. These inspections are conducted by the Relevant Building Surveyor (RBS) or their appointed inspector and are essential to verify that each critical stage of construction meets safety and regulatory standards.
Mandatory inspections are required to:
Confirm compliance with the approved building permit and documentation
Identify and rectify defects or non-compliant work before the next stage proceeds
Ensure the structure is safe and fit for purpose
The specific inspections required are listed in your building permit and will vary depending on the type of construction. However, the most common mandatory inspections include:
Before concrete is poured into footings
Checks excavation size, depth, reinforcement, and site conditions
Before concrete slab is poured or sub-floor framing is enclosed
Verifies moisture barriers, reinforcement, termite protection, and structural integrity
After wall and roof framing is complete but before linings (e.g. plasterboard) are installed
Ensures framing complies with approved plans, spans, tie-downs, bracing, and structural connections
Conducted at the completion of all building works
Confirms that the building is safe, habitable, and complies with all aspects of the building permit
Once all mandatory inspections are successfully completed:
A Certificate of Final Inspection (for alterations or extensions), or
An Occupancy Permit (for new buildings) will be issued by the RBS, allowing lawful use and/or occupation of the building.
Failure to call for a mandatory inspection can lead to:
A Building Notice or Order from council
Refusal to issue an occupancy permit
Penalties under the Building Act
Issues with insurance or future property sales
We assist owners, builders, and developers across Victoria with:
Scheduling and conducting mandatory inspections
Resolving inspection issues and rectification
Issuing occupancy permits and compliance certification
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help you meet your compliance obligations and keep your construction project on track.
Your content is already clear and informative. Below is a polished and formatted version with consistent styling and headings, ideal for use on your website, brochures, or client handouts:
In Victoria, all building work carried out under a building permit is subject to strict time limits, as set out in the Building Act 1993 and the Building Regulations 2018. These timeframes ensure construction starts and finishes within a reasonable period and remains compliant with regulatory standards.
You must commence building work within 12 months from the date the building permit is issued.
If work does not commence within this timeframe, the permit automatically lapses.
You may apply for an extension of time from the Relevant Building Surveyor (RBS) before the permit expires.
Once building work has commenced, it must be completed within:
24 months from the date the building permit was issued (for most residential and commercial building types)
6 months for swimming pools and pool barriers (as specified in the building permit conditions)
⚠️ If work is not completed within the specified time, the permit may lapse. In this case, an Occupancy Permit or Certificate of Final Inspection cannot be issued until the issue is resolved.
If you're unable to commence or complete the work within the permit's timeframe, you may apply to the RBS for an extension. The request must:
Be submitted in writing, and
Be made before the permit lapses
The RBS may request:
A written explanation for the delay
A revised project timeline
Updated documentation or re-inspections, depending on the progress of work
Note: Extensions are not automatic and are granted at the discretion of the building surveyor.
If your building permit lapses:
You may need to apply for a new permit
Any completed work may require re-inspection or re-certification
Additional fees, documentation, or design modifications may be required to comply with updated building codes and regulations
We can assist with:
Checking your building permit’s expiry status
Preparing and submitting extension requests
Revalidating previously completed building work
Liaising with your council and building surveyor to ensure legal compliance
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help keep your building project compliant, efficient, and on track.
An Occupancy Permit is a legal document issued by the Relevant Building Surveyor (RBS) under Section 46 of the Building Act 1993. It signifies that a building (or part of a building) is suitable for occupation or use.
It is not a certification that all construction has been completed exactly as per the plans or without minor defects—it simply authorises occupation based on compliance with the Building Permit, the National Construction Code (NCC), and relevant building regulations.
✅ Authorises Legal Occupation or Use
You cannot occupy or use a new Class 1 (residential house), Class 2–9 (apartment, commercial, industrial, or public) building without an Occupancy Permit (unless exempt).
Occupying a building without a valid permit is a breach of the Building Act and may result in enforcement action or fines.
🛡️ Confirms Compliance at Completion
Confirms that the building is suitable for occupation or use.
Includes verification of critical elements such as:
Fire safety measures
Sanitary and egress facilities
Accessibility provisions (where applicable)
📋 Includes Specific Conditions and Limitations
An Occupancy Permit may specify:
Permitted use of the building
Maximum number of occupants
Required essential safety measures (e.g. fire alarms, exit signs)
Any staged occupation where parts of the building may be used before final completion
🏗️ May Be Issued for Partial Occupation
In some cases, a Partial Occupancy Permit can be granted for staged developments, allowing use of one portion of a building while other sections are still under construction.
An Occupancy Permit is not evidence of full contractual completion or that the building is entirely defect-free. It is not a warranty.
The permit is based on the information and inspections available at the time, and assumes that no unreported or hidden non-compliant works exist.
For Class 1a dwellings (single homes or townhouses), a Certificate of Final Inspection (CFI) may be issued instead of an Occupancy Permit where applicable.
We assist clients with:
Final inspections and permit preparation
Resolving issues that may delay issuance
Liaising with councils and building surveyors
Interpreting the conditions of your Occupancy Permit
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help ensure your building is ready for safe, legal occupation.
In Victoria, certain building proposals may require report and consent from external authorities before a building permit can be issued. This process allows relevant referral authorities—such as local councils, water boards, or the CFA—to assess specific design elements that may impact public safety, infrastructure, or local amenity.
The requirements are governed by the Building Act 1993 and Part 4 of the Building Regulations 2018.
Report and Consent is a statutory approval granted by a designated authority (e.g. council’s planning, engineering, or drainage departments) when a proposed building design:
Varies from prescribed building regulations, or
Impacts infrastructure, environmental, or safety zones
The consent ensures the design is appropriate, despite the proposed variation.
You may need to obtain report and consent before a building permit is issued for the following:
From your local council when proposing:
Reduced front, side, or rear setbacks
Increased site coverage or building height
Non-compliant overshadowing or overlooking impacts
Construction over easements
Building within proximity of a flood-prone or bushfire-prone area
From relevant authorities when:
Building near sewers, drains, or water mains (e.g. from a water authority like Yarra Valley Water)
Building adjacent to a main road or public land (e.g. Department of Transport, VicRoads)
From the Country Fire Authority (CFA) when:
Constructing in Bushfire Management Overlay (BMO) zones
Required to meet defendable space and access conditions
From authorities such as:
Energy Safe Victoria, WorkSafe, or airport authorities, depending on the site location or building function (e.g. buildings near high-voltage lines or in airport overlay zones)
Identify the required reports and consents (your building surveyor or designer can assist)
Submit documentation to the relevant authority, including site plans, justification for the variation, and supporting reports (e.g. engineering or planning assessments)
The authority will issue:
A report (comments or conditions), and/or
Consent (approval to vary the regulation)
⚠️ A building permit cannot be issued until the necessary report and consent is obtained and provided to the Relevant Building Surveyor.
We assist clients with:
Identifying when report and consent is required
Preparing and lodging documentation to councils and referral authorities
Liaising with building surveyors to ensure timely approval
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us streamline the compliance process and help you avoid unnecessary permit delays.
In Victoria, builders are regulated under the Building Act 1993 and must be registered with the Victorian Building Authority (VBA) to carry out building work on most residential and commercial projects. Builders must operate within the scope of their registration class, and their work is subject to strict compliance with the National Construction Code (NCC), relevant Australian Standards, and all applicable permits and approvals.
The VBA registers builders in different classes of building work, each with defined authorities and limitations. Some common classes include:
Domestic Builder – Unlimited (DB-U) Can carry out, manage, and arrange all components of domestic (residential) building work.
Domestic Builder – Limited (DB-L) Limited to specific types of work such as carpentry, waterproofing, bathroom renovations, re-stumping, etc.
Commercial Builder – Limited or Unlimited Authorised to carry out or manage work on Class 2–9 buildings (apartments, commercial, industrial), subject to their registration limits.
Project Manager (Domestic or Commercial) May manage building work but cannot physically carry it out without additional registration.
Builders must only undertake work they are registered and insured to perform. Key limitations include:
🚫 Cannot perform structural work unless registered appropriately e.g., a DB-L (waterproofing) cannot undertake framing or slab work
🚫 Cannot carry out plumbing or electrical work unless separately licensed These trades require separate VBA or Energy Safe Victoria registration
🚫 Must not exceed contract value thresholds without proper insurance Builders performing domestic building work over $16,000 must have Domestic Building Insurance (DBI)
🚫 Must not act outside permit conditions or approved documentation Deviations from approved plans require re-approval or permit amendments
Registered builders must:
Provide a major domestic building contract for residential work over $10,000
Adhere to timelines, quality standards, and contractual obligations
Not demand deposits greater than 5% (for contracts over $20,000)
Give the client a copy of the Consumer Affairs Victoria checklist and approved plans
Builders must ensure that all work complies with:
The National Construction Code (NCC) – Volume 1 or 2
Australian Standards referenced in the NCC (e.g. AS 1684 for timber framing)
The conditions of the building permit
Applicable energy efficiency, accessibility, and fire safety requirements
The builder is legally responsible for:
Supervising all subcontractors and trades under their scope of work
Ensuring compliance at each construction stage
Rectifying defective or non-compliant work
Assisting the Relevant Building Surveyor during inspections
🔒 Note: Even if work is subcontracted, the registered builder retains legal responsibility for compliance.
We help clients:
Verify builder registration classes
Understand their builder’s responsibilities and limits
Resolve disputes involving defective or unauthorised work
Navigate permit and inspection processes
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help ensure your builder is operating within legal limits—and that your project stays compliant and protected.
In Victoria, a demolition permit is required before any demolition work can begin, as regulated under the Building Act 1993 and Building Regulations 2018. This permit ensures that demolition is carried out safely, lawfully, and with due regard to the structural, environmental, and heritage implications of the work.
A Relevant Building Surveyor (RBS) must issue the demolition permit after reviewing all relevant documentation and approvals.
A demolition permit is required for:
Demolishing the whole or part of a building or structure, including:
Houses, commercial buildings, garages, sheds, or verandahs
Load-bearing internal walls (depending on extent and structural impact)
Any building work involving structural removal, alteration, or reduction of the footprint or essential structure
Note: Minor removal of non-structural elements (e.g. plaster, cabinetry) may not require a permit, but it is essential to check with a building surveyor.
To apply for a demolition permit, the following documentation is typically required:
Completed building permit application (Form 1)
You must obtain report and consent from the responsible planning authority under the Planning and Environment Act 1987 if:
Cumulative demolition over the past 3 years amounts to more than 50% of the volume of the building, based on:
The total volume demolished under current and previous building permits within that 3-year period, compared to
The original volume of the building at the time of the first demolition permit issued during that period, OR
The demolition involves any part of the façade of a building, where "façade" is defined as:
Any external wall, verandah, balcony, balustrade, or architectural feature that is attached to or forms part of the external wall
A part of the roof
A chimney …provided it faces a street and is visible from that street.
A copy of the Certificate of Title
A site plan indicating:
The building to be demolished
Any buildings to remain
Distances to boundaries and adjoining structures
Consent from the local council to protect public infrastructure (e.g. footpaths, roads, kerbs)
Confirmation of disconnection from all essential services:
Electricity (from the distributor, not just the retailer)
Water and sewerage (from the relevant water authority)
Gas
Telecommunications
A construction management plan or demolition method detailing:
Site access
Waste removal and recycling
Dust and noise control
Public safety measures
Required when demolishing a part of a building, especially shared walls or buildings on boundaries, to ensure structural stability of adjoining structures
Heritage overlay or planning permit consent may be required from council for heritage-listed or protected properties
Demolition work must be carried out by:
A registered demolisher, or
A licensed builder appropriately registered with the Victorian Building Authority (VBA) for demolition work
It is illegal to commence demolition without a valid permit
Failure to comply may result in:
Building Notices or Orders
Fines up to $92,460 (individuals) or $462,300 (companies)
Liability for damage to adjoining property or public assets
We can assist you with:
Assessing if a demolition permit is required
Preparing and lodging your application
Coordinating required documentation and consents
Ensuring compliance with council, planning, and safety requirements
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help you ensure your demolition is safe, compliant, and hassle-free.
Energy efficiency is a core requirement of the National Construction Code (NCC) and plays a critical role in improving comfort, reducing greenhouse gas emissions, and lowering long-term energy costs for building owners. In Victoria, all new building work and relevant alterations must meet minimum energy efficiency standards as set out in the Building Regulations 2018 and the NCC Volume One (for Class 2–9 buildings) and Volume Two (for Class 1 and 10 buildings).
Energy efficiency requirements apply to:
New homes and residential buildings (Class 1 and 2)
Commercial buildings (Class 3 to 9)
Major alterations or additions to existing buildings that affect the building envelope or building services (e.g. re-cladding, window replacement, HVAC upgrades)
As of NCC 2022 (adopted progressively in Victoria), new residential buildings must generally meet the following requirements:
Achieve a minimum 7-star NatHERS energy rating for thermal performance (previously 6 stars)
Assessed using approved software such as FirstRate5, AccuRate, or BERS Pro
Demonstrates that heating, cooling, lighting, hot water, and appliances are energy efficient
Must meet annual energy use budget based on NCC performance criteria
Appropriate insulation to walls, roofs, floors
High-performance glazing (double glazing or low-e glass where required)
Airtight construction practices and sealing of penetrations
Energy-efficient heating and cooling systems
Use of LED lighting and efficient hot water systems
Energy-efficient ventilation and exhaust systems (e.g. in bathrooms, laundries)
🔁 Alterations to existing homes (e.g. extensions, re-roofing) must also comply where practicable, especially if the work involves new external walls, windows, or roofing.
NCC Volume One outlines energy efficiency requirements for commercial buildings including:
Minimum insulation levels for roofs, walls, and glazing
Energy-efficient lighting, including controls and daylight sensors
Heating, ventilation, and air conditioning (HVAC) systems to meet efficiency benchmarks
Verification through JV3 modelling (Performance Solution) or Deemed-to-Satisfy provisions
A Section J compliance report may be required at building permit stage and for occupancy certification, especially for office, retail, or public-use buildings
Designers and architects must incorporate energy efficiency measures into the design
Energy assessors must prepare and certify NatHERS reports or Section J reports
Builders must follow construction methods that maintain thermal integrity
Building surveyors verify compliance before issuing a building permit and final certification
We assist homeowners, builders, and developers with building permit documentation and compliance certification.
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help you achieve compliance—and create buildings that are energy smart, comfortable, and future-ready.
Evidence of Suitability is a term used in the National Construction Code (NCC) to describe the documentation or information required to demonstrate that a building material, product, system, or method of construction complies with the relevant Performance Requirements of the NCC.
It ensures that materials and building solutions used in a construction project are fit for purpose, meet the minimum safety and performance standards, and are legally accepted by the Relevant Building Surveyor (RBS) when issuing a building permit.
Evidence of Suitability is outlined in Part A5 of the NCC (both Volume One and Two), titled "Documentation of Design and Construction". It provides guidance on the types of documentation that may be used to verify compliance with either:
Deemed-to-Satisfy (DtS) provisions, or
Performance Solutions
According to A5.2 of the NCC, the following are recognised as valid forms of evidence:
✅ CodeMark Certificate of Conformity
Nationally recognised third-party certification under the ABCB scheme
✅ Certificate of Accreditation
Issued by a State or Territory authority to confirm compliance for specific products or systems
✅ Certificate from a Registered Practitioner
For example, a Certificate of Compliance – s.238(1)(a) or (b) under the Building Act 1993 (Vic) from a:
Structural engineer
Fire safety engineer
Building surveyor
Confirms that the design or construction meets the NCC requirements
✅ Test Reports or Assessments
Results from NATA-accredited laboratories or other recognised assessment bodies
✅ Standards Marking or Product Labelling
Evidence that a product is manufactured to an Australian Standard (e.g., AS/NZS 3500 for plumbing)
✅ Other Documentary Evidence
Manufacturer technical specifications, product data sheets, or calculations—if accepted by the building surveyor as adequate
The builder or designer is responsible for providing appropriate evidence of suitability for materials and systems used
The RBS must assess and accept the evidence as valid before issuing or finalising a building permit
Incomplete or invalid evidence may lead to delays, rejection of permits, or non-compliance notices
We assist with:
Reviewing NCC compliance pathways (DtS or Performance Solutions)
Preparing building surveying certificates and compliance statements
Liaising with building surveyors to ensure your documentation is acceptable
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help you meet compliance obligations and keep your project moving forward with confidence.
The Victorian Building Authority published the following practice note and minister's guideline about the relevant requirements for siting specified on Building Regulation 2018.
n Victoria, siting requirements regulate the position and design of a single dwelling (Class 1a building) on a lot to ensure the amenity, privacy, and safety of neighbouring properties. These requirements are set out in Part 5 of the Building Regulations 2018, and are commonly referred to as ResCode provisions when integrated into local planning schemes.
These rules apply when a planning permit is not required, and the building proposal is assessed solely under the building regulations. If a planning permit applies, the council’s planning controls may override or supplement the siting provisions.
If your proposal does not comply with one or more siting regulations, you may apply for report and consent from the local council’s building department. This is not automatic and must demonstrate that the variation:
Will not unreasonably impact neighbouring amenity
Complies with the objectives of the siting regulation
Is supported by affected adjoining property owners (in some cases)
We assist clients with:
Assessing siting compliance under Part 5
Preparing report and consent applications
Liaising with councils and surveyors
Designing compliant layouts for single dwellings
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help you design and build with confidence—while meeting all regulatory and planning obligations.
A Small Second Dwelling (sometimes called a granny flat, dependent person's unit, or secondary dwelling) is a self-contained residential building constructed on the same lot as an existing dwelling. It is designed to provide independent living for a single person or small household, typically a family member or tenant.
As of December 2023, Victoria has adopted state-wide planning reforms to make it easier to build Small Second Dwellings in residential zones without requiring a planning permit, provided certain criteria are met.
To qualify as a Small Second Dwelling under the planning exemption, it must:
Be no larger than 60m² in total floor area
Be located on the same lot as a lawful existing dwelling
Be used for residential accommodation
Not be subdivided (i.e., must remain on the same title as the main dwelling)
⚠️ Important: While planning permits may not be required, the construction of a Small Second Dwelling still requires a building permit and must comply with all relevant Building Regulations and the National Construction Code (NCC).
Yes. Like any other residential building, a Small Second Dwelling must comply with:
A building permit is required prior to construction. The application must be assessed by a Relevant Building Surveyor (RBS) and must include:
Certified design documentation (plans, elevations, sections)
Energy efficiency report (NatHERS or DTS assessment)
Structural engineering (if applicable)
Soil report and site classification
The structure must comply with all relevant NCC requirements for Class 1a buildings, including:
Fire separation (if near or attached to another structure)
Structural adequacy
Energy efficiency (7-star rating under NCC 2022)
Health and amenity provisions (e.g., minimum ceiling heights, ventilation, sanitary facilities)
Safe access and egress
The dwelling must comply with the siting requirements under Part 5 of the Building Regulations 2018, including:
Minimum setbacks from boundaries
Site coverage and permeability
Overshadowing and overlooking controls
Private open space allocation
📝 Note: If your proposal doesn’t comply with any siting rule, you may need to apply for Report and Consent from your local council.
Separate utility connections (electricity, water, sewerage) may be required depending on the servicing authority
Bushfire or flood overlays may require additional design considerations
Development contributions or infrastructure levies may apply in some council areas
We assist clients with:
Building permit applications
Design and NCC compliance
Energy assessments and reports
Report and Consent applications (if needed)
Coordinating with building surveyors and local authorities
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
Let us help you navigate the regulations and deliver your small second dwelling legally, efficiently, and with peace of mind.
A Building Notice is the first formal step in the building enforcement process under the Building Act 1993 (Vic). It is a “show cause” notice issued solely to property owners—not to contractors, builders, or developers. The notice outlines concerns identified by the Relevant Building Surveyor (RBS) and invites the owner or their authorised agent to provide written reasons as to why a Building Order should not be issued.
A Building Notice does not authorise the commencement of any building work. All works must be carried out only after obtaining a valid building permit. Commencing work without the required permit is a serious offence under Section 16 of the Building Act 1993.
A Building Notice remains in force until it is either:
Cancelled by the Relevant Building Surveyor, or
Set aside by the Building Appeals Board.
It may also be superseded by a Building Order, which is binding on current and future owners or occupiers of the property (refer to Section 236 of the Act).
There are three main avenues available to respond to a Building Notice:
You may choose to remove or demolish the unapproved structures and, where necessary, reinstate the building to its previously approved condition. Before commencing any demolition, it is critical to confirm with the compliance officer whether a demolition permit is required. Contact details will be listed in the Building Notice.
You may respond in writing to each item listed in the notice, providing explanations and justifications as to why a Building Order should not be issued.
If you wish to retain all or part of the unapproved building work, you may be required to submit:
A Building Surveyor’s certification and report: A comprehensive assessment from an independent registered building surveyor, including certification under Section 238(1)(b) of the Building Act 1993. This must identify both compliant and non-compliant elements in accordance with the Building Regulations and the Building Code of Australia (BCA).
Note: Submission of documentation does not guarantee approval. All efforts are undertaken at the owner’s risk and cost. Any additional reports, certifications, or professional services are the responsibility of the owner.
Failure to respond to a Building Notice may lead the RBS to issue a Building Order under Section 111 of the Act, directing specific remedial action.
Failure to comply with a Building Order may result in serious legal consequences, including:
✅ Conviction
💰 Substantial Fines:
Up to $462,300 for a body corporate
Up to $92,460 for an individual (per charge)
Applicable to breaches of:
Section 16 – Carrying out building work without a permit
Section 118 – Contravention of a Building Order
🧾 Court-issued Injunctions to:
Enforce the required works, and/or
Recover associated legal costs
If you have received a Building Notice or require expert guidance to respond appropriately, please don’t hesitate to get in touch:
📞 Phone: 0405 956 655 📧 Email: compliance@victorianbuildingsurveyors.com.au
We’re here to help you understand your obligations and navigate the enforcement process with clarity, professionalism, and compliance.
Unauthorised building work can have serious legal and financial consequences. This guide outlines the steps involved in addressing non-compliant work through formal engagement with your local council and certified building professionals.
It is important to understand that a building permit cannot be issued retrospectively for works that have already been completed without prior approval. Where unauthorised work has occurred, the Municipal Building Surveyor (MBS) at your local council is responsible for enforcing the Building Act 1993 and may issue a Building Notice or Building Order.
We strongly recommend formally notifying the MBS of any unauthorised works and requesting an on-site inspection. Taking proactive steps to disclose and address the issue can significantly reduce the risk of legal action and penalties for non-compliance.
Under Section 238(1)(b) of the Building Act 1993, a registered building surveyor may issue a Certificate of Compliance confirming that unauthorised building work meets all applicable legislation and standards.
This certificate may be submitted to the council’s MBS to assist in the evaluation of the unauthorised works and may lead to resolution of enforcement action.
To issue a certificate, the following is required:
✅ A comprehensive on-site inspection
📄 Review of supporting documentation (e.g., building plans, engineering or structural reports)
📏 Confirmation that the work complies with the National Construction Code (NCC) and all relevant Building Regulations
If the work is found to be compliant, a certificate will be issued. Where non-compliance is identified, rectification or a formal building permit process may be required.
If you have received a Building Notice or Building Order and wish to pursue certification of the unauthorised works, our office can assist you through the following process:
Submit copies of the Building Notice/Order and any available documentation outlining the scope of the work completed.
We will provide a formal fee proposal. Upon acceptance, we will schedule an on-site inspection to assess the condition and compliance of the work.
🧾 Inspection Fee (incl. GST): From $1,155.00
Following the inspection, you will receive a detailed report outlining:
Identified compliance issues (if any)
Recommended actions to achieve compliance
If the works are non-compliant, we may:
Decline to issue a certificate
Recommend that a building permit be obtained for rectification works
Where compliance is confirmed, we will issue a Certificate of Compliance for submission to council.
📄 Certification Fee (incl. GST): From $1,155.00
Should remedial works be necessary, our office can also assist with:
Preparing and lodging a building permit application
Coordinating with other professionals (e.g., engineers or draftspersons) as required
Our team is here to guide you through the compliance process with professionalism and efficiency. Whether you're responding to a Building Notice or proactively seeking advice on unauthorised work, we are ready to help.
📞 Phone: 0405 956 655 📧 Email: compliance@victorianbuildingsurveyors.com.au
Let us help you navigate the enforcement process and bring your building works into compliance with confidence.
If your building permit has expired and you have not obtained an Occupancy Permit or Certificate of Final Inspection, it’s important to act promptly to avoid enforcement action or delays in completing your project.
Your first step should be to contact your local council to determine whether there is any record of approval or inspection history for your building work.
✅ If a record exists: You will need to contact the relevant building surveyor who issued the original permit. That surveyor is responsible for assessing and finalising the works.
If that surveyor is no longer available or unwilling to proceed, you may apply to the Victorian Building Authority (VBA) to terminate their appointment and nominate a new building surveyor.
⚠️ If no record is found: The council may issue a Building Notice or Building Order to initiate enforcement action under the Building Act 1993. In this case, prompt action is required to rectify the situation.
If you choose to engage our services, we can assist you through the following process:
🔍 Site Inspection: We will conduct an on-site assessment of the completed works.
📁 Documentation Review: Our team will review any available plans, reports, permits, or compliance documentation.
🏗️ Finalisation Strategy: Based on our findings, we will advise you on the necessary steps to obtain the appropriate Occupancy Permit or Certificate of Final Inspection.
📝 Council Liaison: If enforcement notices have been issued, we can work with you to respond and satisfy council requirements.
🔄 Surveyor Transfer: If needed, we can guide you through the VBA process to replace the appointed building surveyor and ensure your project is properly finalised.
Don’t let an expired permit delay or jeopardise your building project. Contact us today for expert guidance and compliance solutions:
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
We're here to help you resolve outstanding permit issues and bring your project to completion with confidence and compliance.
If you are currently undertaking construction and discover that your work is unauthorised and requires a building permit, it is essential to act immediately to avoid legal consequences and to bring your project into compliance with the Building Act 1993 (Vic).
You may appoint a private building surveyor to assess and issue a building permit for the remaining stages of your construction. During this process, the surveyor may:
Issue a Building Notice for any unauthorised works already completed (e.g., footings, slab)
Require you to demonstrate compliance with relevant structural and regulatory requirements
To comply, you may need to provide:
📄 Certificate of Compliance (s.238(1)(b)) A certificate issued by a qualified structural engineer confirming that the existing works meet structural requirements under the National Construction Code (NCC)
📐 Updated Plans and Documentation Drawings and site plans showing compliance with relevant Building Regulations, including siting requirements (e.g., boundary setbacks, site coverage, overlooking provisions)
Alternatively, you may choose to inform your local council about the unauthorised work. The Municipal Building Surveyor (MBS) can:
Issue a Building Notice under the enforcement provisions of the Building Act 1993
Request you to engage a private building surveyor to:
Inspect the work
Prepare a report and/or
Issue a Certificate of Compliance (s.238(1)(b)) confirming compliance for submission to the MBS
If you engage our services, we can support you through the entire process, including:
🏠 Site Inspection: Evaluate the stage and condition of your current works
📁 Documentation Review: Assess existing plans, permits (if any), and reports
🛠️ Compliance Pathway: Advise on the most appropriate course of action—either through a private permit process or council liaison
📝 Certification: Provide or facilitate the preparation of a Certificate of Compliance under s.238(1)(b), as required by the surveyor or council
Our goal is to help you regularise your works, minimise regulatory risks, and ensure your construction can continue or be finalised legally.
If you’ve realised your building work requires a permit mid-construction, don’t delay. Contact us for practical, compliant solutions:
Phone: 0405 956 655 Email: compliance@victorianbuildingsurveyors.com.au
We’re here to guide you through the process with clarity, professionalism, and peace of mind.